War is a continuation of policy by other means. All wars are inseparable from the political systems that engender them. The policy which a given state, a given. Ironveld is currently working with on review of the strategic alternatives for its mining assets, which include unfettered rights to: 80 million tonnes of magnetite ore which equates to 1.6 billion pounds of Vanadium. 32 million tons of High Purity Iron; 9 million tonnes of Titanium; Strategic Alternatives.

Our projects page

Australian Industrial Energy (AIE) plans to develop a liquefied natural gas (LNG) import terminal at Port Kembla.

The Port Kembla Gas Terminal (PKGT) consists of four key components:

LNG carrier vessels – there are hundreds of these vessels in operation worldwide transporting LNG from production facilities to demand centres.

Our

A Floating Storage and Regasification Unit (FSRU) – a vessel moored at a berth in Port Kembla’ inner harbour. There are 29 FSRUs in operation around the world and a further 75 in the planning stage.

Ourproject

Wharf facilities– offloading arms totransfer the LNG from the carrier into the FSRU

Our project is located in the rural community of El Chimborazo, Nicaragua where the community lacks an adequate and clean source of drinking water. Their current sources of drinking water are small springs that are open to the natural environment, allowing animals and pesticides to contaminate the water, causing the members of the community to. Osiris is working with the CMU Hacking Team (PPP or Plaid Parliament of Pwning) and their faculty adviser, Prof. David Brumley to design a nation-wide high school competition (picoCTF) to encourage computer security and computer science education. 4 ThemeForest Items Currently Viewing. 1 GraphicRiver Items View Portfolio. Deliver better projects faster. Web, design & video assets Unlimited downloads.

Pipeline – a standard high pressure pipeline connection from the FSRU to existing east coast gas transportation network

Our Projects Construction

The PKGT will allow carriers transporting LNG gas to berth adjacent to the FSRU. The LNG carriers’ liquid cargo will then be transferred to the FSRU where it will be stored.This transfer process does notoccur under pressure, which ensures the liquid natural gas remains non-explosive and non-flammable.

When needed, the liquefied natural gas will be warmed on board the FSRU, converting it back into a gas.

The gas will then be transferred, via pipeline, from the FSRU berth to the main east coast natural gas transmission network, connecting the Project to its customer base.

Our Project Begins

Initial Development Consent for the Project was granted by the New South Wales Government in April 2019.

Ourproject.org

In April 2020, the NSW Government approved a Modification to the Development Consent to satisfy a greater than anticipated customer demand for natural gas. The increase in the capacity of the PKGT will be achieved by increasing the number of LNG carriers arriving at the Terminal annually.

Science Experiment Write Up Template

Construction of the PKGT will take around 14-16 months. Work will consist largely of modifications to the existing Berth 101, where the FSRU will be moored for the duration of the Project, and the construction of the natural gas pipeline connecting the PKGT to gas transmission infrastructure.

info@ausindenergy.com
Please note that given the COVID-19 situation, the best way to reach the AIE team is via this email

Our Projects Page

Home
Our Company
Our Project
Fact Sheets
News
Terms of use
Privacy Policy